Memberships
- AWS member
- ASNT member
- ESME (Egyptian Society Of Mechanical Engineers)
- Egyptian Engineering Syndicate
Education
- B.SC of construction equipment, mechanical design and power
- Post graduate studies of mechanical engineering
- Have UT, RT, MT & PT Level-II certificates for welding inspection
Languages
- Arabic
- English
- Italian
Experience
worked for Belayim Petroleum Company (Petrobel) (Joint venture between EGPC & IEOC (Agip-Eni)) for eleven years
Abu Rudies Oil Field as projects mechanical engineer
- Belayim marine platforms upgrading and sea lines laying phase-III
- 6" & 8" sealines repair by diving specialized company (RANA)
- Petreco oil treatment plant up-grading phase-I
- Petreco oil treatment plant up-grading phase-II
- Feiran fire fighting tank-15
- A/R fuel gas station
- A/R power station
- Ras Garra offshore water injection plant on Gara offshore platform
- Hydraulic seal and knock out drum
- A/R desalination unit
- A/R Water injection upgrading project
- Belayim Marine fields, platforms upgrading and sea bed preparation for 12 new offshore pipelines
Work codes & standards
- All AGIP specs
- API
- ASME
- ASTM
- DIN
Petrobel projects Cairo head office as projects planner
- A/R jetty
- A/R tank battery 10-1
- A/R Oil gathering system up-grading
- A/R new water network and infrastructure
- A/R Blanketing system up-grading
- Temsah third flare at Port Said onshore
- Additional condensate storage tank at Port Said onshore
- A/M Baltim communication tower
- A/M Batra-3 flow onshore pipeline
- A/R airport upgrading
- Port Fouad & Darfeel project (onshore plant)
- A/M Baltim project (onshore plant/offshore platforms and sea lines)
- Temsah project (onshore plant/offshore platforms and sea lines) at Port Said offshore
- Temsah NW-1 upgrading at Port Said offshore
- Temsah NW-2 upgrading at Port Said offshore
- Temsah NW-3 upgrading at Port Said offshore
- PF-D platform at Port Said offshore
- Nouras Aegypodes (A&B) at Port Said offshore
- Nouras development project at Port Said offshore
- New 26" sealine and PLEM installation
- Port Fouad Aegypodes upgrading project
Work codes, standards & softwares
- All AGIP specs
- API
- ASME
- ASTM
- DIN
- EasyProject (ARTEMIS) as planning & follow up software
- Premavera planner
Gemsa Petroleum Company (Gempetco) for four years as senior projects & maintenance on/offshore engineer
- Zaafarana production 8" sealine riser repair using the MOREGRIP technique by diving
- Gemsa artificial lift power fluid unit installation & relevant piping
- Gemsa new workshops
- Gemsa new road revamping
- Gemsa new jetty
- New fire water tank at Gemsa plant
- New fire fighting system at Gemsa plant
- Steel renewal of the Al-Zaafarana oil tanker hull while the tanker was on production
- Tenders technical & commercial evaluation committees
Work codes & standards
- API
- ASME
- ASTM
- DIN
IOG CEO from 2007 and present
- Technical support services in oil & gas field
- Hydrocarbons trade
- Consultation services
- Inspection services
- Marine vessels UT surveys
- Materials supply
- Engineering services
INM owner & CEO from 2008 and present
- General contracting
- General supplies & services
ETC CEO from 2003 (part time)
- Soft skills international courses
- Petroleum courses
- HSE international courses
Nationalities worked with
-
Egyptian
-
Italian
-
English
-
American
-
Netherlands
-
UAE
-
KSA
-
Syrian
-
Sudanes
-
Indian
-
German
-
Philipions
-
Spanish
-
French
-
Yemen
-
Kuwait
-
Qatar
-
Jordan
-
Chinese